OUR PROJECTS
Childerditch Re-Clad
Camclad secured this project to Re-Clad the building. After the Principle Contractor had removed the existing vertical asbestos, Camclad were asked to give a solution to Re-Clad onto very anfractuous existing steel frame. The result was installing a secondary support framework to enable a true and level structure to fix our Cladding onto. A challenging project but a very rewarding end product.